You don't have javascript enabled. Good luck with that.
Pencarian
500 Ton Sedimen Diangkat Dari Kali Krukut Petogogan
.
photo Rio Sandiputra - Beritajakarta.id

500 Tons of Krukut River Sediment Transported

The South Jakarta Sub-dept. of Water Management began to dredge sediment in Krukut River, Petogogan Urban Village, South Jakarta as rainy season anticipation.

The dredging was done along 200 meters width and two meters depth

About 500 tons of sediment were transported from the river since Monday (7/27) to Thursday (7/30).

"The dredging was done along 200 meters width and two meters depth," said Suyadi, Head Section of Flood Control System Maintenance for South Jakarta Water Management Sub-department, Friday (7/31).

2 Excavators Sent to Krukut River as Flood Anticipation

Relaying on beritajakarta.com observation, there were two excavators deployed to dredge the sediment.

"Our target is dredging 1,500 meters within 1.5 months. The dry sediment will be transported to Ancol coal fired power plant (PLTU) area," he disclosed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye966 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye778 personBudhi Firmansyah Surapati
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye445 personFolmer
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye410 personTiyo Surya Sakti
  5. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye351 personBudhi Firmansyah Surapati